The names on this page are hidden. Create a free account to reveal 5 records a month, or get Private Credit Intelligence at $249 a month for every name. Every figure, date and source on this page is public either way.

Borrower

T••••••••• C•••

Construction & Engineeringgroup grade Aoff every schedule since Jun 30, 2024sponsor unattributed

Nothing material in the last 200 days. Last change: 30 Jun 2024, Consensus mark 98¢ on cost, down from 100¢ in Q1 2024.

Mark path, consensus per quarter end
Q1 2024: 100¢Q2 2024: 98¢100¢ · 98¢Q1 2024 to Q2 2024
Principal held
at least $250,000
sum of BDC pieces, a lower bound
Fair value
$245,000
98c on cost, debt pieces
Unfunded
Not disclosed
commitments not yet drawn
BDC lenders
1
1 on the latest quarter
Facilities
1
0 equity pieces beside them
Next maturity
Mar 31, 2027
no dated debt inside 24 months
On the tape since
Mar 31, 2024
latest Jun 30, 2024
Events
2
dated, non-routine
Lender marks
each lender's own fair value over cost at Jun 30, 2024, folded to one row per lender
LenderExposureCurrent markQoQ change
A•••••• S•••••••• C••••• F•••$250K98¢-2 pts
Every BDC piece · 2 positions across 1 lenderlargest principal first, with instrument and rate
BDCInstrumentPrincipalFair valueRate
A•••••• S•••••••• C••••• F•••term loan first lien
Asset T••• F•••• L••• T••• L••• R•••••••• R••• and S••••• S + 4.75% I••••••• R••• F•••• 1.
$191,000$187,000
98c
S+475 bp
A•••••• S•••••••• C••••• F•••term loan first lien
Asset T••• F•••• L••• T••• L••• R•••••••• R••• and S••••• S + 5.25% I••••••• R••• F•••• 0.
$59,000$58,000
98c
S+525 bp
Capital structure as the BDCs see it
latest quarter end Jun 30, 2024
FacilityHeldOn costPricingMaturityBDCs
first lien term loan first lien
exited Jun 30, 2024
at least $250,00098cS+525 bpMar 31, 20271
Through time
the borrower's pieces summed across BDCs, every quarter end
Quarter endBDCsPrincipal heldFair valueOn costPIK pieces
Jun 30, 20241$250,000$245,00098c0
Mar 31, 20241$250,000$250,000100c0
What changed
Every change including routine ones
Identity
Group key
TRANSYSTEMSderivedthe codename stem after legal suffixes and deal words
Spellings
1 across 1 BDCderived
Industry
Construction & Engineeringreportedas one filer wrote it