The capital structure graph behind private markets. Who lent, to whom, under which sponsor, through which facility, how large the piece was, when it matures and what changed, with a filing behind every number. A BDC piece is that BDC's piece, a sum of pieces is a lower bound, and a sponsor is named with the evidence that names it.
The names on this page are hidden. Create a free account and they fill in. No card, and every figure, date and source on this page is public either way.
Borrower
S•••• A••••••••• I••
Construction & Engineeringgroup grade Aon a schedule nowsponsor unattributed
Also written as: SimPRO; Sonar
Principal held
at least $130M
sum of BDC pieces, a lower bound
Fair value
$105M
101c on cost, debt pieces
Unfunded
n/a
commitments not yet drawn
BDC lenders
5
3 on the latest quarter
Facilities
1
1 equity pieces beside them
Next maturity
Oct 24, 2030
no dated debt inside 24 months
On the tape since
Dec 31, 2022
latest Jun 30, 2026
Events
1
dated, non-routine
Capital structure as the BDCs see it
latest quarter end Jun 30, 2026
| Facility | Held | On cost | Pricing | Maturity | BDCs |
|---|---|---|---|---|---|
| first lien term loan first lien | at least $130M | 101c | //www.goldmansachsbdc.com/20260630#Bank Bill Swap Bid Rate BBSY+500 bp | Oct 24, 2030 | 4 |
Equity pieces beside the debt: other ($414,000 fair value, 1 BDC)
Lenders
every BDC piece at the latest quarter end
| BDC | Instrument | Principal | Fair value | Rate |
|---|---|---|---|---|
| G•••••• S•••• B••• I••• | term loan first lien 1st Lien/Senior Secured Debt Industry Construction & Engineering Interest Rate 9.36% Refer | $11.2M | $7.7M 104c | //www.goldmansachsbdc.com/20260630#Bank Bill Swap Bid Rate+500 bp |
| G•••••• S•••• B••• I••• | term loan first lien 1st Lien/Senior Secured Debt Industry Construction & Engineering Reference Rate and Spread | $1.1M | $-11,000 138c | //www.goldmansachsbdc.com/20260630#Bank Bill Swap Rate+500 bp |
| G•••••• S•••• B••• I••• | term loan first lien 1st Lien/Senior Secured Debt Industry Construction & Engineering Interest Rate 9.19% Refer | $11.3M | $11.2M 100c | //www.goldmansachsbdc.com/20260630#Bank Bill Swap Rate+500 bp |
| G•••••• S•••• P•••••• C••••• C•••• | term loan first lien 1st Lien/Senior Secured Debt Industry Construction & Engineering Interest Rate 9.36% Refer | $48.1M | $47.6M 100c | //www.goldmansachsbdc.com/20260630#Bank Bill Swap Rate BBSW+500 bp |
| G•••••• S•••• P•••••• C••••• C•••• | term loan first lien 1st Lien/Senior Secured Debt Industry Construction & Engineering Interest Rate 9.36% Refer | $47.6M | $32.6M 104c | //www.goldmansachsbdc.com/20260630#Bank Bill Swap Bid Rate BBSY+500 bp |
| G•••••• S•••• P•••••• C••••• C•••• | term loan first lien 1st Lien/Senior Secured Debt Industry Construction & Engineering Reference Rate and Spread | $4.8M | $-48,000 155c | //www.goldmansachsbdc.com/20260630#Bank Bill Swap Rate BBSW+500 bp |
| P•••••• S••••• B•• L•• | term loan first lien 1st Lien/Senior Secured Debt Industry Construction & Engineering Reference Rate and Spread | $566,000 | $-6,000 150c | //fasb.org/us-gaap/2025#Base Rate+500 bp |
| P•••••• S••••• B•• L•• | term loan first lien 1st Lien/Senior Secured Debt Industry Construction & Engineering Interest Rate 9.36% Refer | $5.7M | $5.6M 100c | //fasb.org/us-gaap/2025#Base Rate+500 bp |
Through time
the borrower's pieces summed across BDCs, every quarter end
| Quarter end | BDCs | Principal held | Fair value | On cost | PIK pieces |
|---|---|---|---|---|---|
| Jun 30, 2026 | 3 | $130M | $105M | 101c | 0 |
| Mar 31, 2026 | 3 | $124M | $108M | 101c | 0 |
| Dec 31, 2025 | 3 | $237M | $187M | 101c | 0 |
| Sep 30, 2025 | 3 | $106M | $83.8M | 100c | 0 |
| Jun 30, 2025 | 4 | $125M | $49.1M | 99c | 0 |
| Mar 31, 2025 | 4 | $136M | $54.3M | 95c | 0 |
| Dec 31, 2024 | 4 | $136M | $54.3M | 95c | 0 |
| Jun 30, 2023 | 1 | $0 | $0 | n/a | 0 |
| Mar 31, 2023 | 1 | $0 | $0 | n/a | 0 |
| Dec 31, 2022 | 1 | $0 | $0 | n/a | 0 |
What changed
- New borrower on a BDC scheduleDec 31, 2022
Sponsor
No sponsor attribution: no portfolio page, deal announcement or Form D signer consensus names an owner for this borrower group.
Identity
- Group key
- SONARderivedthe codename stem after legal suffixes and deal words
- Spellings
- 2 across 5 BDCsderived
- Industry
- Construction & Engineeringreportedas one filer wrote it