The capital structure graph behind private markets. Who lent, to whom, under which sponsor, through which facility, how large the piece was, when it matures and what changed, with a filing behind every number. A BDC piece is that BDC's piece, a sum of pieces is a lower bound, and a sponsor is named with the evidence that names it.

The names on this page are hidden. Create a free account and they fill in. No card, and every figure, date and source on this page is public either way.

Facility

D••••••• C••••••••• second lien delayed draw term loan

second lienoff every schedule since Mar 31, 2026Softwaresponsor L•• C•••••• M••••••••• L••• carried
Principal held
unknown
sum of BDC pieces, a lower bound
Fair value
n/a
n/a on cost
Unfunded
$1.2M
pieces' unfunded commitments
Pricing
unstated
modal across pieces
PIK
none stated
Maturity
unstated
Lenders
0 holding
1 exited · 0 named on a deal
On the tape
8 quarters
Dec 31, 2021 to Mar 31, 2026
Lender group
every BDC that holds or held a piece; each row is that lender's own figures
LenderStatusPrincipalFair valueSpreadHeld
C•••••• S•••••• L•••••• I••
CSL III ADVISOR, LLC
dormantn/an/aJun 30, 2024 to Sep 30, 2024
C•••••• S•••••• L••••••• I•••
CARLYLE GLOBAL CREDIT INVESTMENT MANAGEMENT L.L.C.
exitedn/an/aDec 31, 2021 to Mar 31, 2026
Facility through time
pieces summed per quarter end across the BDCs holding it
Quarter endBDCsPrincipal heldOn costSpreadPIKMaturity
Mar 31, 20261n/an/a
Dec 31, 20251n/an/a
Sep 30, 20251n/an/a
Jun 30, 20251n/an/a
Mar 31, 20251n/an/a
Sep 30, 20241n/an/a
Jun 30, 20241n/an/a
Dec 31, 20211n/an/a
What changed on this facility
position and facility grain, including routine
  • Lender left a facility Mar 31, 2026
    C•••••• S•••••• L••••••• I••• no longer holds D••••••• C••••••••• delayed draw after 2026-03-31; 1 BDC(s) still hold it
  • Facility left every BDC schedule Mar 31, 2026
    D••••••• C••••••••• delayed draw (second lien) left every BDC schedule after 2026-03-31 (2 lenders, $.0M last held)
  • New lender joined a facility Jun 30, 2024
    C•••••• S•••••• L•••••• I•• joins D••••••• C••••••••• delayed draw (second lien) held by 1 other BDC
Other pieces of this borrower's structure
How this facility is known
Grain
D••••••• C••••••••• x second lien delayed draw term loanderivedborrower group x kind x lien; tranches with different maturities sit under it
Size
lower bound: sum of BDC piecesderived
Sponsor basis
the sponsor's own portfolio page lists a company of this namederived
Status
unknownsignalnon-accrual, default and restructuring are not on this tape and are never inferred from a mark
Origin
bdc tapereported