The capital structure graph behind private markets. Who lent, to whom, under which sponsor, through which facility, how large the piece was, when it matures and what changed, with a filing behind every number. A BDC piece is that BDC's piece, a sum of pieces is a lower bound, and a sponsor is named with the evidence that names it.

The names on this page are hidden. Create a free account and they fill in. No card, and every figure, date and source on this page is public either way.

Facility

V•• H••••• other

lien unstatedoff every schedule since Sep 30, 2024
Principal held
at least $30.0M
sum of BDC pieces, a lower bound
Fair value
$29.7M
100c on cost
Unfunded
n/a
pieces' unfunded commitments
Pricing
S+500 bp
modal across pieces
PIK
none stated
Maturity
Apr 16, 2030
html_schedule
Lenders
0 holding
2 exited · 0 named on a deal
On the tape
3 quarters
Jun 30, 2024 to Sep 30, 2024
Lender group
every BDC that holds or held a piece; each row is that lender's own figures
LenderStatusPrincipalFair valueSpreadHeld
N••••• C•••••••• P•••••• C••••• F•••
CHURCHILL ASSET MANAGEMENT LLC
dormant$5.9M$5.9M
100c
500 bpJul 31, 2024 to Jul 31, 2024
N••••• C•••••••• D••••• L•••••• C••••
CHURCHILL DLC ADVISOR LLC
exited$15.9M$15.8M
100c
500 bpJun 30, 2024 to Sep 30, 2024
N••••• C•••••••• P•••••• C•••••• I••••• F•••
CHURCHILL PCIF ADVISOR LLC
exited$14.1M$13.9M
100c
500 bpJun 30, 2024 to Sep 30, 2024
Facility through time
pieces summed per quarter end across the BDCs holding it
Quarter endBDCsPrincipal heldOn costSpreadPIKMaturity
Sep 30, 20242$30.0M100c500 bpApr 16, 2030
Jul 31, 20241$5.9M100c500 bp
Jun 30, 20242$30.0M100c500 bpApr 16, 2030
What changed on this facility
position and facility grain, including routine
  • Facility left every BDC schedule Sep 30, 2024
    V•• H••••• other (unknown) left every BDC schedule after 2024-09-30 (3 lenders, $30.0M last held)
  • Lender left a facility Sep 30, 2024
    N••••• C•••••••• D••••• L•••••• C•••• no longer holds V•• H••••• other after 2024-09-30; 1 BDC(s) still hold it
  • Lender left a facility Sep 30, 2024
    N••••• C•••••••• P•••••• C•••••• I••••• F••• no longer holds V•• H••••• other after 2024-09-30; 1 BDC(s) still hold it
Other pieces of this borrower's structure
This is the only piece of the borrower on the tape.
How this facility is known
Grain
V•• H••••• x otherderivedborrower group x kind x lien; tranches with different maturities sit under it
Size
lower bound: sum of BDC piecesderived
Status
unknownsignalnon-accrual, default and restructuring are not on this tape and are never inferred from a mark
Origin
bdc tapereported