The names on this page are hidden. Create a free account to reveal 5 records a month, or get Private Credit Intelligence at $249 a month for every name. Every figure, date and source on this page is public either way.

Facility

A••• C•••••• T•••• C••• first lien term loan

first lienheld todayBuilding Productssponsor not established · possible relationship
Principal held
at least $5.1M
sum of BDC pieces, a lower bound
Fair value
$5.0M
99c on cost
Unfunded
Not disclosed
pieces' unfunded commitments
Pricing
SOFR+475 bp
pieces from 475 bp to 525 bp
PIK
0.50%
paid in kind, the highest piece
Maturity
Apr 30, 2028
tagged by the filer
Lenders
2 holding
0 exited · 0 named on a deal
On the tape
12 quarters
Sep 30, 2023 to Jun 30, 2026
Lender group
every BDC that holds or held a piece; each row is that lender's own figures
LenderStatusPrincipalFair valueSpreadHeld
S•••••••• P•••••• C••••• F••• L••
S•••••••• G•••• P•••••• D••• L••
held$4.8M$4.8M
99c
475 bpSep 30, 2023 to Jun 30, 2026
A•••••• S•••••••• C••••• F•••
A•••••• C•••••• C••••• A••••••• L••
held$245,000$228,000
93c
525 bpMar 31, 2024 to Jun 30, 2026
Facility through time
pieces summed per quarter end across the BDCs holding it
Quarter endBDCsPrincipal heldOn costSpreadPIKMaturity
Jun 30, 20262$5.1M99c475 bp0.50%Apr 30, 2028
Mar 31, 20262$5.1M99c525 bp0.50%Apr 30, 2028
Dec 31, 20252$10.0M99c475 bpApr 1, 2026
Sep 30, 20252$5.1M99c475 bpApr 1, 2026
Jun 30, 20252$5.1M100c475 bpApr 1, 2026
Mar 31, 20252$5.1M100c475 bpApr 1, 2026
Dec 31, 20242$19.9M100c475 bpApr 1, 2026
Sep 30, 20242$5.2M100c475 bpApr 1, 2026
Jun 30, 20242$5.2M100c485 bpApr 1, 2026
Mar 31, 20242$5.2M100c475 bpApr 1, 2026
Dec 31, 20231$5.0M100cApr 1, 2026
Sep 30, 20231$5.0M99c485 bpApr 1, 2026
What changed on this facility
position and facility grain, including routine
  • Maturity approaching Apr 30, 2028
    ••• Locked
  • Maturity extended (observed) Mar 31, 2026
    ••• Locked
  • PIK interest appears Mar 31, 2026
    ••• Locked
Other pieces of this borrower's structure
This is the only piece of the borrower on the tape.
How this facility is known
Grain
A••• C•••••• T•••• C••• x first lien term loanderivedborrower group x kind x lien; tranches with different maturities sit under it
Size
lower bound: sum of BDC piecesderived
Possible relationship
T•• L•, not establishedestimateda company of this name is on the sponsor's portfolio page; no deal party names it, so it is not shown as the sponsor
Sponsor basis
the sponsor's own portfolio page lists a company of this namederived
Status
performingsignalnon-accrual, default and restructuring are not on this tape and are never inferred from a mark
Origin
bdc tapereported