The capital structure graph behind private markets. Who lent, to whom, under which sponsor, through which facility, how large the piece was, when it matures and what changed, with a filing behind every number. A BDC piece is that BDC's piece, a sum of pieces is a lower bound, and a sponsor is named with the evidence that names it.

The names on this page are hidden. Create a free account and they fill in. No card, and every figure, date and source on this page is public either way.

Facility

T•• B•••• I•• first lien delayed draw term loan

first lienoff every schedule since Sep 30, 2024Construction and Engineering
Principal held
at least $69.6M
sum of BDC pieces, a lower bound
Fair value
$69.6M
110c on cost
Unfunded
n/a
pieces' unfunded commitments
Pricing
S+600 bp
modal across pieces
PIK
none stated
Maturity
Jun 30, 2028
html_schedule
Lenders
0 holding
1 exited · 0 named on a deal
On the tape
8 quarters
Dec 31, 2022 to Sep 30, 2024
Lender group
every BDC that holds or held a piece; each row is that lender's own figures
LenderStatusPrincipalFair valueSpreadHeld
H•• C•••••••• L•••••• F•••
HPS ADVISORS, LLC
exited$69.6M$69.6M
110c
600 bpDec 31, 2022 to Sep 30, 2024
Facility through time
pieces summed per quarter end across the BDCs holding it
Quarter endBDCsPrincipal heldOn costSpreadPIKMaturity
Sep 30, 20241$69.6M110c600 bpJun 30, 2028
Jun 30, 20241$69.8M110c600 bpJun 30, 2028
Mar 31, 20241$70.0M110c600 bpJun 30, 2028
Dec 31, 20231$70.1M111c600 bpJun 30, 2028
Sep 30, 20231$70.3M110c600 bpJun 30, 2028
Jun 30, 20231$70.5M105c600 bpJun 30, 2028
Mar 31, 20231$70.7M106c600 bpJun 30, 2028
Dec 31, 20221n/an/a
What changed on this facility
position and facility grain, including routine
  • Facility left every BDC schedule Sep 30, 2024
    T•• B•••• I•• delayed draw (first lien) left every BDC schedule after 2024-09-30 (1 lender, $69.6M last held)
Other pieces of this borrower's structure
How this facility is known
Grain
T•• B•••• I•• x first lien delayed draw term loanderivedborrower group x kind x lien; tranches with different maturities sit under it
Size
lower bound: sum of BDC piecesderived
Status
unknownsignalnon-accrual, default and restructuring are not on this tape and are never inferred from a mark
Origin
bdc tapereported