The capital structure graph behind private markets. Who lent, to whom, under which sponsor, through which facility, how large the piece was, when it matures and what changed, with a filing behind every number. A BDC piece is that BDC's piece, a sum of pieces is a lower bound, and a sponsor is named with the evidence that names it.

The names on this page are hidden. Create a free account and they fill in. No card, and every figure, date and source on this page is public either way.

Borrower

S•••• T•••••• L•• S••••••••

Distributiongroup grade Aon a schedule nowsponsor unattributed
Principal held
at least $12.8M
sum of BDC pieces, a lower bound
Fair value
$20.4M
101c on cost, debt pieces
Unfunded
n/a
commitments not yet drawn
BDC lenders
1
1 on the latest quarter
Facilities
1
1 equity pieces beside them
Next maturity
Apr 24, 2031
no dated debt inside 24 months
On the tape since
Sep 30, 2025
latest Jun 30, 2026
Events
2
dated, non-routine
Capital structure as the BDCs see it
latest quarter end Jun 30, 2026
FacilityHeldOn costPricingMaturityBDCs
first lien term loan first lienat least $12.8M101cSOFR+550 bpApr 24, 20311
Equity pieces beside the debt: preferred equity ($7.7M fair value, 1 BDC)
Lenders
every BDC piece at the latest quarter end
BDCInstrumentPrincipalFair valueRate
F•••• I••••••••• C•••preferred equity equity
Preferred Equity (6 units) Investment date 7/2/2025
n/a$7.7M
180c
F•••• I••••••••• C•••term loan first lien
First Lien Debt Variable Index Spread (S + 5.50%) Variable Index Floor (2.00%) Rate Cash 9
$12.8M$12.8M
101c
SOFR+550 bp
Through time
the borrower's pieces summed across BDCs, every quarter end
Quarter endBDCsPrincipal heldFair valueOn costPIK pieces
Jun 30, 20261$12.8M$12.8M101c0
Mar 31, 20261$8.5M$8.5M101c0
Dec 31, 20251$8.5M$8.4M100c0
Sep 30, 20251$8.5M$8.4M100c0
What changed
Identity
Group key
SOGNO TOSCANO SPECIALTYderivedthe codename stem after legal suffixes and deal words
Spellings
1 across 1 BDCderived
Industry
Distributionreportedas one filer wrote it