The names on this page are hidden. Create a free account to reveal 5 records a month, or get Private Credit Intelligence at $249 a month for every name. Every figure, date and source on this page is public either way.

Borrower

V••••••• M••••••••• G•••• H•••••••• L••

Construction & Engineeringgroup grade Aon a schedule nowsponsor unattributed
Also written as: V••••••• M••••••••• Group, LLC
Principal held
unknown
sum of BDC pieces, a lower bound
Fair value
$23.2M
101c on cost, debt pieces
Unfunded
n/a
commitments not yet drawn
BDC lenders
1
1 on the latest quarter
Facilities
1
2 equity pieces beside them
Next maturity
May 12, 2028
no dated debt inside 24 months
On the tape since
Jun 30, 2023
latest Jun 30, 2026
Events
2
dated, non-routine
Capital structure as the BDCs see it
latest quarter end Jun 30, 2026
FacilityHeldOn costPricingMaturityBDCs
first lien term loan first lienunknown101cMay 12, 20281
Equity pieces beside the debt: other ($400,000 fair value, 1 BDC), preferred equity ($7.5M fair value, 1 BDC)
Lenders
every BDC piece at the latest quarter end
BDCInstrumentPrincipalFair valueRate
S••• M••••••• L•••• M••••••••• C•••••• C•••preferred equity equity
Interest Rate 8% Preferred Return - Acquisition Date 5/12/2023
n/a$7.5M
406c
S••• M••••••• L•••• M••••••••• C•••••• C•••term loan first lien
First lien senior secured term loan Spread Above Index S + 8.52% - Interest Rate 12.25% -
n/a$15.2M
101c
S••• M••••••• L•••• M••••••••• C•••••• C•••unstated lien unstated
Acquisition Date 4/14/2026
n/a$400,000
93c
Through time
the borrower's pieces summed across BDCs, every quarter end
Quarter endBDCsPrincipal heldFair valueOn costPIK pieces
Jun 30, 20261$0$15.2M101c0
Mar 31, 20261$0$12.0M101c0
Dec 31, 20251$0$23.8M100c0
Sep 30, 20251$0$9.2M102c0
Jun 30, 20251$0$7.4M102c0
Mar 31, 20251$7.4M$7.4M102c0
Dec 31, 20241$0$7.4M103c0
Sep 30, 20241$4.6M$4.6M103c0
Jun 30, 20241$4.6M$4.6M103c0
Mar 31, 20241$4.6M$4.5M103c0
Dec 31, 20231$4.6M$4.4M100c0
Sep 30, 20231$4.6M$4.4M100c0
Jun 30, 20231$4.6M$4.4M100c0
What changed
Identity
Group key
VERTICAL MECHANICALderivedthe codename stem after legal suffixes and deal words
Spellings
2 across 1 BDCderived
Industry
Construction & Engineeringreportedas one filer wrote it