The capital structure graph behind private markets. Who lent, to whom, under which sponsor, through which facility, how large the piece was, when it matures and what changed, with a filing behind every number. A BDC piece is that BDC's piece, a sum of pieces is a lower bound, and a sponsor is named with the evidence that names it.

The names on this page are hidden. Create a free account and they fill in. No card, and every figure, date and source on this page is public either way.

Borrower

D••••••••• • I••••••••• m••• i• G•••••• • T• E••••••• M•••• G•••

Construction & Buildinggroup grade Aon a schedule nowsponsor unattributed
Principal held
at least $103,000
sum of BDC pieces, a lower bound
Fair value
$103,000
100c on cost, debt pieces
Unfunded
n/a
commitments not yet drawn
BDC lenders
1
1 on the latest quarter
Facilities
1
0 equity pieces beside them
Next maturity
Apr 30, 2030
no dated debt inside 24 months
On the tape since
Mar 31, 2026
latest Mar 31, 2026
Events
2
dated, non-routine
Capital structure as the BDCs see it
latest quarter end Mar 31, 2026
FacilityHeldOn costPricingMaturityBDCs
first lien term loan first lien
exited Mar 31, 2026
at least $103,000100c2.75%Apr 30, 20301
Lenders
every BDC piece at the latest quarter end
BDCInstrumentPrincipalFair valueRate
S••••• C•••• C•••••• C•••term loan first lien
First Lien - Term Loan
$103,000$103,000
100c
2.75%
Through time
the borrower's pieces summed across BDCs, every quarter end
Quarter endBDCsPrincipal heldFair valueOn costPIK pieces
Mar 31, 20261$103,000$103,000100c0
What changed
Identity
Group key
DESCRIPTION MADE IN GERMANY TK ELEVATORderivedthe codename stem after legal suffixes and deal words
Spellings
1 across 1 BDCderived
Industry
Construction & Buildingreportedas one filer wrote it